Air Dry Vacuum Metallization Top Coats
Location:Home > Products
Air Dry Vacuum Metallization Top Coats Contents
Product items Coating Application Baking Temperature and Time Applicable Materials and Features
UT-801 Top Coat Spraying Air Dry or 50-60°C ; 10-15 mins Applicable to quick drying for packaging products.Excellent performance on gloss, quick drying, fullness, color rendering, abrasion resistance.
UT-117 Top Coat Spraying Air Dry or 50-60°C ; 10-15 mins Applicable to need moisture resistance, workability of auto spraying equipment, large amount of production. Excellent rework, leveling.
UT-811 Top Coat Spraying Air Dry or 50-60°C ; 10-15 mins Applicable to quick drying for packaging products. Excellent performance on gloss, leveling, quick drying, liquor soaking durability.
UT-846-2 Top Coat Spraying Air Dry or 50-60°C ; 10-15 mins Applicable to products need good color rendering and cold dying. Excellent performance on gloss, fullness, color fastness, color rendering.
UT-815 “Semi Water-Based” Top Coat Spraying 50-60°C ; 10-15 mins Semi water-based top coat. Work in high humid environment. Not corrode aluminum layer. Smooth coating surface. Excellent performance on adhesion, gloss, abrasion resistance, moisture resistance.
UT-816 Top Coat Spraying Air Dry or 50-60°C ; 10-15 mins Applicable to quick drying for packaging products.Excellent performance on quick drying, abrasion resistance, gloss.
UT-842 Top coat Spraying Air Dry or 50-60°C ; 10-15 mins Applicable to products need moisture resistance and abrasion resistance. Excellent performance on moisture resistance, gloss, leveling, abrasion resistance.

1.     Above products must be stored in cool and dry place under 40℃. The expired time is one year in unopened situation. Please finishing within one week after the cap opening.

2.     Due to the ingredient of UT-815, it’s not easy to solute with dark color such as Aqua and Green, please test before producing. To ensure the quality of finished products, must clean the sprayer and pipe with Ketone solvent before spraying if it worked with other coats. After baking, strongly suggest to leave the finished products four hours before packing to prevent plastic bag mark on products’ surface.

3.     Plastic materials usually contaminated with internal lubricant, mold release agent, and dust during injection process. To ensure good adhesion and smooth surface during VM, please clean the material with solvent before coating process.